11/28/2023 0 Comments Concrete wall scaffold brackets(d) shall have all fittings and gear, including base plates or wheels, installed in accordance with the manufacturer’s instructions (c) shall have footings, sills or supports that are sound, rigid and capable of supporting at least two times the maximum load to which the scaffold may be subjected without settlement or deformation that may affect the stability of the scaffold (b) shall have horizontal members that are adequately secured to prevent lateral movement and that do not have splices between the points of support (a) shall have uprights braced diagonally in the horizontal and vertical planes to prevent lateral movement (3) The constructor shall make available to an inspector upon request a copy of the certification by the professional engineer. (2) A professional engineer shall verify and certify the results of a test and the corresponding rated load of the scaffold. (1) The failure load of a scaffold which consists of structural components whose capacity cannot be determined by testing shall be established by testing the components in a manner that simulates the actual loading conditions for which each of the components is fabricated. (3) No scaffold shall be loaded in excess of the load that it is designed and constructed to bear. (2) Despite clause (1) (a), a scaffold with structural components whose capacity can only be determined by testing shall be designed and constructed to support or resist three times the maximum load or force to which it is likely to be subjected without causing the failure of any component. (b) four times the maximum load or force to which it is likely to be subjected without overturning. (a) two times the maximum load or force to which it is likely to be subjected, without exceeding the allowable unit stresses for the materials of which it is made and (1) Every scaffold shall be designed and constructed to support or resist, (2) A worker who is on or under a scaffold, a suspended work platform system or a multi-point suspended work platform while it is being erected, altered or dismantled shall be on a part of the scaffold, suspended work platform system or multi-point suspended work platform that meets the requirements of this Regulation. (1) Where work cannot be done on or from the ground or from a building or other permanent structure without hazard to workers, a worker shall be provided with a scaffold, a suspended work platform, a boatswain’s chair or a multi-point suspended work platform that meets the requirements of this Regulation. Occupational Health and Safety Act and Regulations for Construction Projects states:ġ25. Please refer to OHSA and Regulations for Construction projects for information about planks.The maximum load per bracket should not exceed 2.4 kilonewtons per square metre.The maximum distance between any two brackets should not exceed 2.1 metres.Do not use this product when you are tired, ill, upset, or under the influence of drugs, alcohol or medication. Only those people deemed competent should work with or near this product.If damages are beyond repair the scaffold bracket should be taken OUT OF SERVICE, recycled (where recycling facilities exist) and replaced. Defects should be noted and repaired by a qualified person before scaffold bracket is used. Scaffold brackets should be checked before and during use for any defects.PLEASE CHECK WITH YOUR HEALTH AND SAFETY OFFICER AND THE MOST RESENT OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS FOR ANY ADDITIONAL HEALTH AND SAFETY PROCEDURES THEY MAY BE IN PLACE. FAILURE TO DO SO CAN RESULT IN SERIOUS INJURY OR EVEN DEATH. THIS IS ONLY A GUIDE AS CONSTRUCTION SITES VARY GREATLY AND WE CAN NOT BE RESPONSIBLE FOR HOW THIS PRODUCT IS USED. OPERATIONAL MANUAL FOR 20” STEEL SCAFFOLD BRACKETS SOLD BY CORRIVEAU CONCRETE FORMING SUPPLIES LTD.ĬAUTION: READ AND FOLLOW OPERATING INSTRUCTIONS.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |